BASIC UPDATES   BACK TO MAIN PAGE

From CAMP WORK DAY June 2, 2007

Cabins 1 and 2 - the back sides facing the ramp into the boys dorm have been painted, and the front side of cabin 1 facing the dining hall was both scraped and painted.  these three walls need another coat of white.

Area was weedwacked around cabins 1 and 2 and boys dorm.  leaves and brush still need to be removed. 

Walls are competely out of girls dorm except support beams of course.   Lumber was taken out of girls dorm and put on a wagon where UncleD. will keep it dry in the barn.

The ladies did a bit of cleaning in the Kitchen and Dining room area. 

From before June 2, 2007

The area right across from the tabernacle / behind evangelist cabin was filled in with dirt and fill from the town, Cliff has been working hard no that and has it pretty well leveled out and looking real nice.  It will be usable for their camper space and others in the future.  It cleans up the rock wall area quite nice.

NOTICE:  Before reading updates note that there is still TONS more to do.  More man power is needed.